Stabilizer.
Yesterday put yourself in NATO, when the opportunity came to watch him, saw that I had a feeling of some incredible monumentality and at the same time, the same lightness. Such an incongruous combination..
There was a feeling of unease over this state of wonder..
PS. How long can I keep the anchor in NATO?
There was a feeling of unease over this state of wonder..
PS. How long can I keep the anchor in NATO?
Michael_ allowed to work multiple programs with one anchor, or on each individual anchor?
How influential placement in the "sandwich" (e.g. communication or control) upper and lower position of the 2 anchors?
To reinforce the connection (channel) it is permissible to use the Amplifier? How better in this case to place a bunch of anchors-programmes "sandwich" on the stage or together with the Stabilizer, for example in the "zone Amplifier"?
When roughly want the rest (of the top of the list) programs?
Is it possible to "charge" the water for use inside on the pitch Stabilizer?
Sincerely, MAG.no
How influential placement in the "sandwich" (e.g. communication or control) upper and lower position of the 2 anchors?
To reinforce the connection (channel) it is permissible to use the Amplifier? How better in this case to place a bunch of anchors-programmes "sandwich" on the stage or together with the Stabilizer, for example in the "zone Amplifier"?
When roughly want the rest (of the top of the list) programs?
Is it possible to "charge" the water for use inside on the pitch Stabilizer?
Sincerely, MAG.no
1. allowed, but in some cases it is better to do individual(for situation, feelings and often more powerful).
2. control works with one anchor operator anchor is no need to specify control only works with the operator of the stabilizer
communication is feelings for her from the situation, it is symmetric. A sandwich is not obligatory, you can just place the anchors nearby and the relationship between them.
place the anchors in this case is better for the object table.
3. receipt of the remaining programs planned for the next week, but there's the holidays... don't know exactly how to do that. I think after the new year will DEFINITELY be all in stock, including additional basic.
4. it is possible, but it is clear that the properties will be different, depending on the space charge (on the field).
2. control works with one anchor operator anchor is no need to specify control only works with the operator of the stabilizer
communication is feelings for her from the situation, it is symmetric. A sandwich is not obligatory, you can just place the anchors nearby and the relationship between them.
place the anchors in this case is better for the object table.
3. receipt of the remaining programs planned for the next week, but there's the holidays... don't know exactly how to do that. I think after the new year will DEFINITELY be all in stock, including additional basic.
4. it is possible, but it is clear that the properties will be different, depending on the space charge (on the field).
Михаил_ wrote:we have to be careful with the conditions much different it is normal, they can be sticky and then so stay
Михаил_ wrote:I think good double sided tape, sometimes a thin and narrow plastic.
Sincerely, MAG.no
P. S. Gain the whole list:)I would like to discuss details:)
P. S. S. the Question is not the topic - what is Your FAVORITE TOY was as a child and where she is now? Remember???
If the question is for all, mine was a paper doll, drawn by own hand and a bunch of them dresses, and especially holiday dresses there was one big star (the location a little below the beltМаг.нет wrote: P. S. S. the Question is not the topic - what is Your FAVORITE TOY was as a child and where she is now? Remember???
New Year on the nose, good memories
MAG.no, thank you for your question
As an example one common.
1-2-3-4-5-1-...
to the aspect of feedback is the satisfaction with results,
fixing trends in section 5, until the need to continue processing when receiving a response about the decline in sales below normal =5-1-2-3-4-5-...
the Norm - the profits pay for all operating costs and income =... rubles per month.
Something like this, I would add to this anchor program:
control
(mine is on the way). In some cases, sufficient "buildup"
1-2-3-2-3-2-3-...-5.
To improve the efficiency of the original study (some market research), the definition (programming) of the forms "response feedback", the extension language aspects p.2 (programming Laws in this aspect, for example, "Advertising costs = no more than 10% of net profit+net profit = at least 1000% of the advertising expenses"other options) and others methods of marketing technology.
Move along this curve poluvagonami-semicircle-diagonal-... it is desirable to produce upon receipt (even a small and not direct) feedback feedback. Tracking of the results fixing attention on the positive trends can greatly improve management efficiency.
Michael_ Your comments and additions...
Malika (probably Sunday) in the PM to consider individual details.
Sincerely, MAG.no<
If you are satisfied with the efficiency of the process of the present moment, this processing once, immediately fix the anchor in the aspect of creativity or development, if desired developmental trends in the process:), you can start processing:)Management effectiveness of advertising - the wording of the anchor;
1. Impact of advertising is a process - formulation aspect of the area of NATO;
2. Advertising - the engine of sales - formulation aspect of the area of law;
3. Invariance - empowerment - formulation aspect of the area of chaos;
4. the Development and increase of sales - formulation aspect of the area development;
5. Fixation trends the formulation of aspect areas work.
1-2-3-4-5-1-...
to the aspect of feedback is the satisfaction with results,
fixing trends in section 5, until the need to continue processing when receiving a response about the decline in sales below normal =5-1-2-3-4-5-...
the Norm - the profits pay for all operating costs and income =... rubles per month.
Something like this, I would add to this anchor program:
1-2-3-2-3-2-3-...-5.
To improve the efficiency of the original study (some market research), the definition (programming) of the forms "response feedback", the extension language aspects p.2 (programming Laws in this aspect, for example, "Advertising costs = no more than 10% of net profit+net profit = at least 1000% of the advertising expenses"other options) and others methods of marketing technology.
Move along this curve poluvagonami-semicircle-diagonal-... it is desirable to produce upon receipt (even a small and not direct) feedback feedback. Tracking of the results fixing attention on the positive trends can greatly improve management efficiency.
Michael_ Your comments and additions...
Malika (probably Sunday) in the PM to consider individual details.
Sincerely, MAG.no<
